MV&P Layout Development in Pictures


July 2006 - August 2006

July - August 2006
Upper level takes shape.

By late July, upper level benchwork is nearly complete. Bridge installed over Meramec River. Later, the track on the bridge was replaced with a section of Walthers Code 83 Bridge Track.
4% Grade benchwork framing completed. Brewery complex roughed in on upper level. A true micro-brewery.
Cargill elevator roughed in on upper level. Barn appears to have encountered a twister during our move. Fortunately, the damage was easily repaired

more photos