MV&P Layout Development in Pictures
July 2006 - August 2006
July - August 2006
Upper level takes shape.
![]() |
![]() |
| By late July, upper level benchwork is nearly complete. | Bridge installed over Meramec River. Later, the track on the bridge was replaced with a section of Walthers Code 83 Bridge Track. |
![]() |
![]() |
| 4% Grade benchwork framing completed. | Brewery complex roughed in on upper level. A true micro-brewery. |
![]() |
![]() |
| Cargill elevator roughed in on upper level. | Barn appears to have encountered a twister during our move. Fortunately, the damage was easily repaired |