MV&P Layout Development in Pictures


2005 - July 2006

September 2005
The trainroom as it looked before starting the layout.

View to the left of the door View to the right

 

October - November 2005
Valance and Benchwork Construction Begins

   
October: Valance framed, hardboard backdrop under construction.
Valance framing - side view.
Incadescent bulbs mounted on valance Mid-Nov '05. Valance primed. Valance lights installation completed. Backdrop painted.
Primed valance. Benchwork framing in progress. Late Nov. '05 Valance painted. Mopac sign up. Lower level framing incomplete.

 

January thru July 2006
Trackwork & More Benchwork Construction

Jan. '06: Trackwork begins on lower level. Frame at top of photo is for support of upper level. Laser level used to help with track allignment.
May 2006: Trackwork on the 4% grade. Later, a double crossover was inserted into the straight section between the two tracks. Another view of the grade showing benchwork. The upper level has not been constructed yet.
Grade that climbs from lower level to upper level. July 2006: Grade continues to upper level. A bridge will be installed where the double track goes down to single track (see bridge image below).

more photos