MV&P Layout Development in Pictures
2005 - July 2006
September 2005
The trainroom as it looked before starting the layout.
![]() |
![]() |
| View to the left of the door | View to the right |
October - November 2005
Valance and Benchwork Construction Begins
![]() |
![]() |
| October: Valance framed, hardboard backdrop under construction. |
Valance framing - side view. |
![]() |
![]() |
| Incadescent bulbs mounted on valance | Mid-Nov '05. Valance primed. Valance lights installation completed. Backdrop painted. |
![]() |
![]() |
| Primed valance. Benchwork framing in progress. | Late Nov. '05 Valance painted. Mopac sign up. Lower level framing incomplete. |
January thru July 2006
Trackwork & More Benchwork Construction
![]() |
![]() |
| Jan. '06: Trackwork begins on lower level. Frame at top of photo is for support of upper level. | Laser level used to help with track allignment. |
![]() |
![]() |
| May 2006: Trackwork on the 4% grade. Later, a double crossover was inserted into the straight section between the two tracks. | Another view of the grade showing benchwork. The upper level has not been constructed yet. |
![]() |
![]() |
| Grade that climbs from lower level to upper level. | July 2006: Grade continues to upper level. A bridge will be installed where the double track goes down to single track (see bridge image below). |